Facilities & Operations
Office: 2.400 M2
Factory: 7000 M2
Just in front of the highway in anew development industrial area
Manufacturing plant is equipped with
- 2 CAROUSEL STORAGE UNITS
- 4 SAWING BENCHES
- 1 WELDING ROBOT
- 28 CNC MACHINES (VERTICAL / HORIZONTAL)
- 7 PRESSURE TESTING BENCHES
- UP TO 1600 BAR H2O
- UP TO 1600 BAR GAS
- PMI / MPE / DPI / UT EQUIPMENT
- QUALITY CONTROL AREA
- 3 CRYOGENIC TESTING UNITS
- 1 FIRE SAFE TESTING UNIT
- 1 FE LEAK FINDER
- 3 TORQUE TESTING EQUIPMENT